Replacement of Systems

 
“System replacement” gathers ESM that are technical and require direct investment.
 
This category is specifically dedicated to the analysis and optimisation of ventilation, central heating and water heating systems that have been changed in the 5 last years.
System replacements are distinguished from other refurbishment operations as they differ in terms of frequency (once every 10-15 years instead of 25 years as is common for refurbishment) and skills (the staff managing the heating, water heating and ventilation systems are specialists; they are part of the “maintenance department” whereas the personnel managing retrofitting are part of the “development and retrofitting department.”)

WP5 Typology: System Replacement

WP5Typology: Potential ESMs

WP5 Typology: ESMs collected by AFTER participating SHOs